Design
McL worked on the upgrade of an existing facility to survey and replace instrumentation as required to match the client’s current process requirements. Control system architecture was redesigned to meet the client’s current control system protocol. Control panels were redesigned to incorporate new PLC controllers and associated hardware.
Automation
PLC code and graphics for new equipment and conversion of PLC code and graphics for PLC controllers which were been upgraded.
Construction Management
Responsible for the delivery and installation of equipment and instrumentation onsite to meet project schedule milestones. Co-ordination between equipment vendors and local contractors to ensure that all works were carried out in accordance with client specifications. Reviewed and approved instrumentation and control panel specifications.
Commissioning and Validation Responsible for writing and executing and commissioning and validation documentation